Dyness Stack314 16kWh High Voltage Battery Module

KSh 270,000.00

  • Module: S51314, 51.2V and 314Ah, giving 16.076kWh
  • Usable: Close to 15.3kWh once the 95 percent discharge limit applies
  • Cells: Sixteen lithium iron phosphate cells of just over a kilowatt hour each
  • Cluster: Three to fifteen modules, reaching 241kWh
  • Column: Eight modules advised before a second column, giving 128.6kWh
  • Current: 140A recommended, 200A continuous maximum, 290A peak
  • Gentler rate: The same amperes as the Stack280 on a larger cell
  • Weight: 115kg a module, heavy enough to need a hoist on site
  • Room: Eight modules want 2,658mm between slab and soffit
  • Scale: Twelve clusters in parallel reach 2.89MWh
– +
SKU: BC-BAT-DYNESS-S51314 Category: Brand:

Description

The Dyness Stack314 stores energy for commercial sites in S51314 modules of 16.076 kilowatt hours apiece, each one sixteen lithium iron phosphate cells wired to 51.2 volts and 314 ampere hours. They seat on one another with no cable to run in between, and a controller at the summit takes care of switching and of talking to the inverter.

It is the Stack280 with larger cells, and almost nothing else has changed. The footprint, the module height, the base, the control unit, the clearance requirement, the column height and the current limits are all identical. What rises is the energy: about twelve percent more per module, for four and a half percent more weight.

That makes it an unusually clean upgrade. The same floor position, in the same room, with the same cabling and the same inverter arrangement, holds more energy.

  • A full column of eight modules holds 128.6 kilowatt hours
  • A full cluster of fifteen reaches 241.1 kilowatt hours
  • The floor area per stack is unchanged at 770 by 425 millimetres
  • Twelve clusters in parallel reach 2.89 megawatt hours
  • The smallest system is three modules, already 48.2 kilowatt hours

There is a quieter benefit in that arithmetic. Because the current limits did not rise alongside the capacity, the same amperes now represent a gentler rate of work for the cells. Section seven explains why that changes which inverter a single cluster will comfortably serve.

Dyness Stack314 16kWh Module: Column Planning, Ceiling Height and Inverter Pairing

1. Technical Specifications

Parameter Value
Module name S51314
Battery type Lithium iron phosphate
Module voltage and capacity 51.2V, 314Ah
Module energy 16.076kWh
Usable energy per module About 15.3kWh at 95 percent depth of discharge
Cells per module 16, each 3.2V and about 1,005Wh
Modules in series 3 to 15 per cluster
Modules per column Two columns advised above 8
Energy per cluster 48.23kWh to 241.14kWh
Nominal cluster voltage 153.6V to 768V
Operating voltage 134V at three modules up to 876V at fifteen
Recommended current 140A, about 0.45C
Maximum continuous current 200A, about 0.64C
Peak discharge current 290A for 2 minutes at 25C
Depth of discharge 95 percent
Cycle life 8,000 cycles or 10 years
Cycle life test conditions 0.2C charge and discharge, 25C, 95 percent depth
Communication CAN and RS485
Module dimensions 770 wide, 425 deep, 230.5 tall
Single module weight 115kg
Full column height About 2,208mm at eight modules
Clearance above the system 450mm minimum
Floor to ceiling required Greater than 2,658mm at eight modules
Charging temperature 0C to 55C
Discharging temperature minus 20C to 55C
Protection level IP20, indoor positions only
Fire protection Aerosol extinguisher built into each module
Installation method Stack type, rackless, no cabling between modules
Cooling Forced air
Monitoring Built in wireless with app updates
Clusters in parallel Up to 12, reaching 2.89MWh
Warranty 10 years
Certification CE-EMC, CE-RED, UN38.3

Two notes on that table. The cycle figure is quoted against gentle test conditions, a 0.2C rate at 25 degrees, and no remaining capacity percentage is published alongside it, so it describes endurance rather than what the cells will still hold at the end. And the certifications listed are those the manufacturer states for this model; if a tender or an institutional specification names a particular cell safety standard, confirm it against current certificates before bidding.

2. Key Points

  • Each module holds 16.076 kilowatt hours from sixteen large format cells
  • Twelve percent more energy than the previous range, in the same box
  • Footprint, height, clearance and current limits are all unchanged
  • The same currents now represent a lower rate of work for the cells
  • A full column of eight gives 128.6 kilowatt hours
  • A module weighs 115 kilograms, which rules out manual placement
  • A 95 percent discharge depth leaves barely any capacity stranded
  • Charging stops at zero degrees while discharging continues far below
  • Each module has an aerosol suppression device sealed inside it
  • Twelve clusters in parallel reach 2.89 megawatt hours

3. Ceiling Height And Column Planning

Headroom is the constraint that decides most layouts on this range, and the figure catches people out. Dyness ask for 450 millimetres to stay empty above the finished stack. Below that the arithmetic is simple: a 133 millimetre base, then one 230.5 millimetre layer for each module and one more for the controller sitting above them.

Modules Energy Column height Floor to ceiling needed Under a 2.4m ceiling
3 48.2kWh 1,055mm 1,505mm Fits
4 64.3kWh 1,286mm 1,736mm Fits
5 80.4kWh 1,516mm 1,966mm Fits
6 96.5kWh 1,747mm 2,197mm Fits
7 112.5kWh 1,977mm 2,427mm Does not fit
8 128.6kWh 2,208mm 2,658mm Does not fit

Under a standard 2.4 metre ceiling the practical limit is six modules, which is 96.5 kilowatt hours. Seven needs 2,427 millimetres and a 2.4 metre room does not have it. Eight needs 2,658 millimetres and calls for a 2.7 metre room or a taller service area.

Above eight modules the manufacturer advises splitting into two columns in any case. In practice the ceiling settles that question before the module count does, and a design that assumed one tall column frequently becomes two shorter ones once the room is measured. Each additional column needs its own floor position and its own expansion package, so this is worth establishing before the layout is drawn rather than after.

4. Floor Loading

Modules in column Energy Module mass Load per square metre
3 48.2kWh 345kg About 1,055kg
4 64.3kWh 460kg About 1,405kg
5 80.4kWh 575kg About 1,755kg
6 96.5kWh 690kg About 2,110kg
7 112.5kWh 805kg About 2,460kg
8 128.6kWh 920kg About 2,810kg

Only the modules are counted there; hardware above and below adds a little more. Set against an office floor built for perhaps 250 to 300 kilograms in each square metre, a loaded stack asks for roughly ten times as much, which is why slabs and ground level positions are the usual choice. Anything suspended, or anything above the ground floor, wants an engineer’s opinion while the module count can still change.

5. Handling 115 Kilogram Modules

  • Each module is 115 kilograms, beyond what a team should lift unaided
  • The uppermost module on a full column goes above 1.7 metres
  • Lifting equipment belongs in the plan from the beginning
  • Doorways, corners, thresholds and lift capacity all need measuring first
  • Stairs are rarely a realistic route for a module of this mass
  • Easiest of all is a ground level room a lorry can pull up to

None of that appears as a line on an equipment quotation, which is exactly why it causes trouble. A battery can be entirely right for the application and still be undeliverable to the room chosen for it.

6. Charging In Cold Places

The two temperature windows are not symmetrical and the difference matters on highland sites.

  • Discharging runs from minus 20 degrees up to 55
  • Replenishing is allowed between zero and 55 degrees and nowhere else
  • Dyness publish no sub zero charging option against these modules

Supplying through a freezing night costs nothing at all. Replenishing is the half that waits, and it waits until the air around the cells has recovered past zero. High ground in Kenya does reach that mark after dark, and a store room with no insulation around it tracks the outside air almost exactly. Putting the stack within the heated shell of a building settles the matter, provided somebody raises it while the drawings are still open.

7. Which Inverter One Cluster Will Serve

Battery power is voltage times current. Current is capped per cluster while voltage climbs with the module count, so the module count effectively decides how large an inverter the storage can feed.

Modules Nominal voltage Energy At 140A recommended At 200A maximum
8 409.6V 128.6kWh 57.3kW 81.9kW
10 512.0V 160.8kWh 71.7kW 102.4kW
12 614.4V 192.9kWh 86.0kW 122.9kW
15 768.0V 241.1kWh 107.5kW 153.6kW

The larger inverters, where this range differs

A 110 kilowatt three phase machine drawing from a full fifteen module cluster asks for about 143 amperes. On this range that is roughly 0.46C and only a couple of percent above the recommended current, which is a reasonable place to run. On the previous 280 ampere hour range the identical inverter at the identical current worked the cells at about 0.51C, noticeably harder, which is why a second cluster was the better answer there.

So the larger cell quietly changes the recommendation. A 110 kilowatt inverter on a single full cluster is sound here. A 125 kilowatt machine asks for about 163 amperes, which is sixteen percent above the recommended rate on either range, so that one still wants two clusters and gains the extra stored energy in the bargain.

Smaller machines

  • A 30 kilowatt hybrid is served comfortably by a short cluster
  • A 50 kilowatt machine wants around seven modules at the recommended rate
  • An 80 kilowatt machine sits comfortably on eleven or twelve
  • Matching at the recommended current rather than the maximum lengthens cell life

8. Installation And Commissioning

Before anything is ordered

  • Measure the ceiling, then decide the module count
  • Establish whether the room forces a second column
  • Satisfy yourself the slab takes the loading set out earlier
  • Pin down how it reaches the room and what lifts it there
  • Confirm the room stays above freezing all year
  • Check your machine accepts the voltage span your chosen count produces

Building the column

  • The base is anchored before any module is lifted onto it
  • Modules go on singly, each located and then locked down
  • Nothing is wired module to module; the seating faces pass the current
  • The control unit finishes the column once the modules are seated
  • Two column arrangements are joined by the expansion package cabling
  • Wall fixings and earthing are completed before the system is woken

Before leaving site

  • See per module readings appear on the inverter screen and read sensibly
  • Programme the current ceilings down to the advised rate rather than the maximum
  • Check the extinguisher indication on each module
  • Verify zero volts at the posts first; this level of direct current kills
  • Demonstrate isolation to whoever holds responsibility for the room
  • Record how many modules, arranged how, across what voltage span

9. Care And Operations

  • Dryness year round, since no part of this carries a moisture rating
  • Never let the space fall to zero, or replenishment simply halts
  • Preserve the clear space above the column, since cooling depends on it
  • Keep ambient temperature moderate, because heat shortens cell life
  • Favour the recommended rate over the maximum wherever the design allows
  • Watch cell voltage spread in the monitoring at service visits
  • Keep the isolation point labelled and reachable
  • Time any later additions to fall within the mixed age allowance

10. Stack314 Or Stack280

These two ranges share a chassis. Choosing between them is almost entirely a question of energy per position rather than of layout, because the layout does not change at all.

Measure Stack280 Stack314
Module energy 14.336kWh 16.076kWh
Module weight 110kg 115kg
Energy per kilogram 0.130kWh 0.140kWh
Footprint 770 by 425mm 770 by 425mm
Module height 230.5mm 230.5mm
Full column height About 2,208mm About 2,208mm
Clearance required 450mm 450mm
Energy per full column 114.7kWh 128.6kWh
Energy under a 2.4m ceiling 86.0kWh 96.5kWh
Recommended current 140A, which is 0.50C 140A, which is 0.45C
Maximum current 200A, which is 0.71C 200A, which is 0.64C
Peak current 280A 290A
Maximum cluster 215.0kWh 241.1kWh
Maximum system 2.58MWh 2.89MWh
Load per square metre, full column About 2,690kg About 2,810kg

Reading that table

  • Twelve percent more energy for four and a half percent more mass
  • Not one millimetre of extra floor space or room height
  • The same control unit, base and expansion parts serve both
  • The cells work at a lower rate for the same delivered power
  • A single cluster becomes a reasonable match for a 110 kilowatt inverter
  • The floor carries about four percent more at a full column

Where a site is tight on space or headroom, the newer range gives more for the same room. Where an existing installation is being extended, the older range remains the match for what is already standing, since mixing capacities within a series string is not how these are designed to run. And where a specification names particular standards, check the certification listed for the model being quoted rather than assuming the ranges are identical on paper as well as in the flesh.

11. Suitable Applications

  • Manufacturing carrying production through grid interruptions
  • Hotels and lodges away from the dependable parts of the network
  • Hospitals and clinics with storage behind the critical supply
  • Schools and colleges with heavy daytime demand and roof area
  • Chillers and produce handling, where an outage ruins what is stored
  • Supermarkets and retail carrying substantial refrigeration
  • Telecommunications and data sites needing long autonomy
  • Peak shaving against demand charges on commercial tariffs
  • Large arrays generating well beyond daytime consumption

12. Why Buy From Bicity Solar

  • A tape run up the wall before anyone commits to a capacity
  • A clear answer on whether it is the building splitting your stack, not the kilowatt hours
  • Loading checked for the count you are actually buying, on the floor you actually have
  • Access and hoisting agreed while the order can still be changed
  • Highland temperature limits put on the table during design
  • Inverter matched at the recommended current, not the ceiling
  • Advised honestly when the older range is the better fit for an extension
  • Certification listings checked against what a tender actually requires
  • The cycle number put in context of how it was measured
  • Figures we cannot stand behind simply omitted from your paperwork
  • A handover where each module is shown reporting to the machine
  • Genuine product, with paperwork matching the delivery
  • EPRA licensed crews who spend their weeks on systems this size
  • Delivered countrywide, with service and expansion support afterwards

This range gives you twelve percent more energy in exactly the same floor space and room height as the one before it. The question is rarely whether it fits the budget and almost always whether it fits the room, because a full column needs 2,658mm from floor to ceiling and a standard 2.4 metre room allows six modules rather than eight.

Give us four things: your target capacity, the machine it has to feed, which floor it stands on and how high the room is. Back comes the module count, how many stacks that becomes, what the slab will carry and whether your inverter is happier on one cluster or two. Work the wider system through the Solar Calculator, or pass the site details to us via My Quote.

Need Help? Chat with us!
Start a Conversation
Hi! Click one of our members below to chat on WhatsApp
We usually reply in a few minutes