Bicity Solar Energy Suppliers

Dyness STACK314 BDU and Base High-Voltage Control Unit SBDU200

KSh 250,000.00

  • Model: SBDU200, which runs and isolates one Stack314 cluster
  • Holds nothing: No cells sit inside, and it adds no kilowatt hours
  • Weight: 19.2kg for the unit, with the standard base a further 18.8kg
  • Size: 770 by 425 by 160mm, with the base adding 133mm beneath the stack
  • Rating: 200A continuous, across 134.4 to 864 volts
  • Includes: The standard base, which the column stands on
  • Excludes: The expansion base, supplied separately for a second column
  • Quantity: One per cluster, even where that cluster runs as two columns
  • Column limit: Eight modules, which is 128.6kWh
  • Protection: IP20, so indoor positions only
– +
SKU: BC-BAT-DYNESS-SBDU200-314 Category: Brand:

Description

The Dyness SBDU200 controls and isolates a Stack314 cluster. It sits at the top of the column once the modules are seated, and it is where the stored energy meets the inverter.

Unlike most parts of this kind, it comes with published specifications of its own rather than only system level figures. The manufacturer states 770 by 425 by 160 millimetres, 19.2 kilograms, 200 amperes continuous, an operating window of 134.4 to 864 volts and an IP20 rating. Those are the numbers on this page.

It ships with the standard base, not the expansion base. The standard base is what a single column stands on and it accounts for 18.8 of the 38 kilograms the controller and base weigh together. The expansion base is a different item, supplied with its own upper cover at 18.5 kilograms combined, and it belongs to a second column rather than the first.

So a single column system is this unit plus modules. A two column system is this unit, plus modules, plus the separate expansion items that carry the second base, its cover and the cables joining the columns. Ordering only the first and expecting it to cover the second leaves a job that cannot be finished.

  • A single controller governs the cluster however many positions it occupies
  • A cluster is three to fifteen modules, and a single stack holds at most eight
  • The column rises 230 millimetres for each module above a 133 millimetre base
  • The controller adds a further 160 millimetres at the top
  • Total mass follows 38 kilograms plus 115 for every module fitted

Dyness Stack314 SBDU200: Published Specifications, Fitting and Column Limits

1. Specifications For The Unit Itself

These are the manufacturer’s own figures for the controller as a component, which is unusual for this class of part and makes planning considerably easier.

Parameter Value
Model SBDU200
Operating voltage 134.4V to 864V
Maximum continuous current 200A
Dimensions 770mm wide, 425mm deep, 160mm tall
Weight 19.2kg
Protection level IP20, indoor positions only
Standard base dimensions 770mm wide, 425mm deep, 133mm tall
Standard base weight 18.8kg, being the 38kg pair less the unit
Expansion base and cover 18.5kg combined, cover 80mm tall
Position in column Fitted last, above the top module
Quantity required One per cluster, including two column clusters

The cluster it controls

Parameter Value
Module served S51314, 51.2V and 314Ah, 16.08kWh
Usable energy per module 15.28kWh
Modules per cluster 3 to 15 in series
Modules per stack 8 maximum
Energy per cluster 48.228kWh to 241.14kWh
Recommended rate 0.45C, being 140A and 7.168kW per module
Maximum rate 0.64C, being 200A and 10.24kW per module
Peak discharge current 280A for 2 minutes at 25C
Depth of discharge 95 percent
Column dimensions 770 by 425 by (293 plus 230 per module) mm
Column mass 38kg plus 115kg per module
Cycle life 8,000 cycles at 0.2C, 25C, 95 percent depth, to 70 percent remaining
Charging temperature 0C to 55C
Discharging temperature minus 20C to 55C
Communication CAN and RS485, with wireless and app
Clusters in parallel Up to 12, reaching 2.89MWh
Cooling Forced air
Fire protection Aerosol extinguisher, acting within 5 seconds
Warranty 10 years
Certification UN38.3, CE-EMC, IEC 62619

The cycle figure is quoted with its end point stated, which not every battery specification does: 8,000 cycles to 70 percent of original capacity, measured at a gentle 0.2C rate at 25 degrees. Heavier daily cycling and warmer rooms both shorten that in service.

2. What Ships With It

Included

  • The controller itself at 770 by 425 by 160 millimetres
  • Its ordinary base, measuring 133 millimetres deep in height
  • Brackets and masonry bolts for securing the column to a wall
  • The plug in resistor that closes the communication loop
  • Communication cables to the inverter for both protocols
  • Power cables to the inverter
  • Fixing screws, ring terminals and the paperwork

Supplied separately, for a second column only

  • Its expansion base, which is not the same component as the ordinary one
  • The expansion upper cover, 80 millimetres tall
  • Those two weighing 18.5 kilograms between them
  • The parallel communication cable linking the columns
  • The series cables carrying current between them

The distinction between the two bases is worth holding onto. They are separately weighed and separately supplied, and a quotation that mentions only a controller has not covered a two column layout.

3. Key Points

  • Switching and isolation are its work; storing energy is not
  • Published specifications of its own, which this class of part rarely has
  • 19.2 kilograms, against 18.8 for the standard base beneath the stack
  • 160 millimetres tall, so it adds less height than a module does
  • Rated 200 amperes continuous across 134.4 to 864 volts
  • One unit serves a cluster of up to fifteen modules
  • A single stack holds eight modules, so larger clusters run as two
  • Both columns of one cluster share this single controller
  • You get the ordinary base in the box; the expansion one you buy
  • IP20 only, so it belongs indoors and in the dry

4. Column Height, And A Figure Worth Checking

The manufacturer’s column formula is a 293 millimetre fixed portion, being the 133 millimetre base plus this 160 millimetre controller, with 230 millimetres added for every module.

Modules Energy Column height With 450mm clearance Column mass
3 48.2kWh 983mm 1,433mm 383kg
4 64.3kWh 1,213mm 1,663mm 498kg
5 80.4kWh 1,443mm 1,893mm 613kg
6 96.5kWh 1,673mm 2,123mm 728kg
7 112.5kWh 1,903mm 2,353mm 843kg
8 128.6kWh 2,133mm 2,583mm 958kg

Why seven modules needs confirming

There is a genuine inconsistency in the manufacturer’s own documentation here, and it lands precisely on the decision most buyers face. The datasheet puts this controller at 160 millimetres, which produces the heights above. The user manual for the same range describes the controller as 230 millimetres and states a full column of 2,208 millimetres needing 2,658 millimetres of room height, figures that follow from the taller unit.

Seventy millimetres separates the two accounts, and seven modules sits on exactly that line. By the datasheet a seven module column wants 2,353 millimetres and fits a standard 2.4 metre room. By the manual it wants 2,427 millimetres and does not.

So before anyone commits to seven modules under a standard ceiling, the height of the unit actually supplied should be confirmed. The difference between six and seven modules is sixteen kilowatt hours, which is worth a measurement rather than an assumption. Where a room comfortably exceeds either figure the question never arises, and where headroom is tight we confirm with the supplier before quoting.

5. Floor Loading

Total mass follows a simple rule: 38 kilograms for the controller and base together, plus 115 kilograms for each module. The footprint stays at 770 by 425 millimetres, which is about 0.33 square metres.

  • A six module column is 728 kilograms, near 2,225 for each square metre
  • A seven module column is 843 kilograms, near 2,575 per square metre
  • A full eight module column is 958 kilograms, near 2,925 per square metre
  • An office floor is typically designed for 250 to 300 per square metre
  • Ground slabs are the normal answer and suspended floors need assessing

The datasheet itself carries an instruction on this point, telling the reader to evaluate the floor where an installation sits on an upper storey before settling how many stacks to build. That is unusual advice to find printed on a specification sheet and it is worth following literally.

6. How Many Units A Layout Needs

Arrangement Modules Controllers Expansion items
One stack 3 to 8 1 None
Two stacks, by module count 9 to 15 1 1 set
Two stacks, forced by room height 7 or 8 1 1 set
Separate clusters in parallel Up to 15 each 1 each As each needs
Largest system 12 clusters 12 As each needs

The third row is the one that surprises people. A layout can be pushed into two stacks by the ceiling rather than by capacity, and when that happens the expansion items become necessary even though the module count alone would not have required them.

7. The Same Name On Two Different Heights

One caution deserves its own section, because it can quietly spoil a calculation.

The controller for the previous Stack280 range carries the same SBDU200 designation as this one, but its published height is 230 millimetres rather than 160, which makes the fixed portion of that range’s column 363 millimetres rather than 293.

  • Applying this range’s figure to a Stack280 column understates its height by 70 millimetres
  • That error eats directly into the clear space required above the stack
  • Applying the Stack280 figure here merely overstates, which is the safer mistake
  • The model designation alone does not tell you which height you have
  • Confirm against the documentation for the range being supplied

We hold these as separate stock items for exactly this reason, and we check the figure against the range being quoted rather than against the model name.

8. Installation Notes

The wall and the room

  • Pick a wall solid enough for anchors, because the stack ties into it
  • Confirm the clear space above is free of pipework, ducting and light fittings
  • Allow working room on the open sides of the footprint
  • Leave its front panel within reach so switching stays accessible
  • Indoor positions only, because nothing here is rated against water

Build sequence

  • Mark, bore and bolt down the base ahead of any lifting
  • Place each module singly and lock it before the next goes on
  • Nothing is wired between modules, as the seating faces pass the current
  • The controller completes the stack once every module is seated
  • Two stack systems are joined using the expansion cabling
  • Wall fixings and earthing are finished before the system is woken

Before handover

  • See per module readings arriving at the inverter and reading sensibly
  • Dial the limits back to the recommended figure, leaving the ceiling unused
  • Verify zero volts at the posts before any work, as this level of current kills
  • Show whoever holds the keys where and how to isolate
  • Record the module count, the stack arrangement and the voltage span
  • Commissioning handled by people who work on storage of this size

9. Care And Operations

  • Dryness all year, since the equipment carries no moisture rating
  • Preserve the clear space above, because cooling and access both depend on it
  • Keep airflow around the stack unobstructed
  • Exercise the breaker at service visits to confirm it still moves freely
  • Inspect the wall fixings and the earth connection when servicing
  • Satisfy yourself that both the app and the machine still see the cluster
  • Store leftover connectors alongside the handover file

10. Do’s And Don’ts

Do

  • Measure the room before settling on a module count
  • Confirm the controller height where seven modules is being considered
  • Order expansion items whenever a design runs to two stacks
  • Work out if headroom, not kilowatt hours, is dividing the stack
  • Treat the standard base as included and the expansion base as extra
  • Keep the terminating resistor safe from delivery until commissioning
  • Have the slab evaluated before choosing anywhere above ground level

Don’t

  • Expect it to add storage, because it contains no cells
  • Assume the expansion base arrives with it
  • Buy a second controller for a second stack of the same cluster
  • Carry this range’s height figure across to the previous range
  • Site it against anything too weak to hold the anchors
  • Run the cluster at its maximum rate as a matter of routine

11. Compatibility

  • Stack314 S51314 modules at 51.2 volts and 314 ampere hours
  • Anything from three modules to fifteen, across one position or a pair
  • High voltage inverters covering 134.4 to 864 volts as built
  • The Solis three phase hybrid line at 30 kilowatts and above
  • Growatt units designed around high voltage storage
  • Either CAN or RS485 carries the link to the machine
  • Parallel arrangements of up to twelve clusters

This part is built for Stack314 and nothing else. The Stack100 controller will not substitute for it, the Stack280 unit carries the same name on a different published height, and wall hung 48 volt batteries have no use for it whatever, since each of those looks after itself.

12. Why Buy From Bicity Solar

  • Specifications taken from the manufacturer’s current datasheet, with the version noted
  • The seven module question raised with you rather than guessed at
  • Controller height confirmed against the range actually being supplied
  • Told which base is included and which one you still need
  • One controller quoted per cluster, never one per stack
  • Room height measured before a capacity is agreed
  • Floor loading worked from the published mass formula
  • Wall construction checked, since the stack fixes back to it
  • Expansion items quoted upfront where a layout needs them
  • Cycle life quoted with its end point and test conditions intact
  • Commissioning that proves every module reports to the inverter
  • Authentic stock, and documentation that agrees with what arrives
  • Licensed under EPRA, and working at this scale week in week out
  • Delivered countrywide, with expansion support afterwards

Two things decide whether a quotation for this is complete. It arrives with the standard base and not the expansion base, so a two stack layout needs the expansion items as well. And if you are considering seven modules in a standard height room, the controller height is worth confirming first, because the manufacturer’s own documents differ by 70 millimetres and seven modules sits right on that line.

Send us your room height, the wall you plan to fix to, the floor it stands on and the capacity you are after. We will confirm the module count, how many stacks that becomes, what the slab carries and which expansion items the layout needs. Work the wider system through the Solar Calculator, or pass your site details to us via My Quote.

Need Help? Chat with us!
Start a Conversation
Hi! Click one of our members below to chat on WhatsApp
We usually reply in a few minutes